Peggy Corbett Award and Memorial Hall Library Entrance Construction Project 1994: Difference between pages

From Andover Answers
(Difference between pages)
Jump to navigation Jump to search
(New page: *Named for Peggy Corbett, a former Andover High School science teacher, the award encourages creative teaching of science in the classroom. *Peggy Corbett Awards: Kindling Creativity in ...)
 
No edit summary
 
Line 1: Line 1:
*Named for Peggy Corbett, a former Andover High School science teacher, the award encourages creative teaching of science in the classroom.


*Peggy Corbett Awards: Kindling Creativity in the Classroom. ''Andover Townsman'' January 4, 2007.
In 1993, Memorial Hall Library and the Trustees of Memorial Hall Library undertook a front-entrance redesign project to return the building to front landscape and walkway design closer to the original  1920s entrance look and feel. Local landscape arctitect Peter Hornbeck and Andover architect Jane Griswold collaborated on the design which included native plantings, an oval brick patio and granite curbing. Project funding included individual and corporate private donors, Memorial Hall Library Trustee funds and state funds.
 
The front entrance project was originally part of a major 1987 renovation and addition project. Due to a state-funding budget shortfall, the front-entrance redesign project was not underway until  the summer of 1994.
 
[[File:MHLFrontEntranceRedesign.jpg]]
 
[[:File:Wiki.png]]
 
<br style="clear:both;" />
<br style="clear:both;" />



Revision as of 12:08, 18 November 2019

In 1993, Memorial Hall Library and the Trustees of Memorial Hall Library undertook a front-entrance redesign project to return the building to front landscape and walkway design closer to the original 1920s entrance look and feel. Local landscape arctitect Peter Hornbeck and Andover architect Jane Griswold collaborated on the design which included native plantings, an oval brick patio and granite curbing. Project funding included individual and corporate private donors, Memorial Hall Library Trustee funds and state funds.

The front entrance project was originally part of a major 1987 renovation and addition project. Due to a state-funding budget shortfall, the front-entrance redesign project was not underway until the summer of 1994.

File:MHLFrontEntranceRedesign.jpg

File:Wiki.png



back to Main Page