Andover - Town Meetings and Memorial Hall Library Entrance Construction Project 1994: Difference between pages

From Andover Answers
(Difference between pages)
Jump to navigation Jump to search
No edit summary
 
No edit summary
 
Line 1: Line 1:
The first town meeting of record in Andover was held in January 1656 to clarify land ownership.  Dudley Bradstreet, son of Anne and Simon, was Andover's first town clerk.
<br><br>
Memorial Hall Library holds microfilm, audio, video and written transcripts of Andover Town Meetings.  <br>
* Microfilm - 1657 to 1998
* Printed - 1656 - 2011
* Audio - 1986 -
* Video - 1996 -
* DVD - 2007 -
<br>
Location of Town Meeting materials in the library:
*Some written transcripts are found in the Andover Room.
*Earlier audio and video are found in the Andover Room.
<br><br>
See


*"Early Andover: Of wine, whiskey and winter," ''Andover Townsman'', December 6, 2012, page 14.
In 1993, Memorial Hall Library and the Trustees of Memorial Hall Library undertook a front-entrance redesign project to return the building to front landscape and walkway design closer to the original  1920s entrance look and feel.  Local landscape arctitect Peter Hornbeck and Andover architect Jane Griswold collaborated on the design which included native plantings, an oval brick patio and granite curbing. Project funding included individual and corporate private donors, Memorial Hall Library Trustee funds and state funds.
* ''Andover Room Holdings'' notebook, page 79
 
* [http://andover.mvlc.org/opac/en-US/skin/default/xml/rresult.xml?rt=title&tp=title&t=andover%20town%20meeting&ft=&l=5&d=1&f=at  Andover Town Meeting materials.]
The front entrance project was originally part of a major 1987 renovation and addition project. Due to a state-funding budget shortfall, the front-entrance redesign project was not underway until  the summer of 1994.  
 
[[Image:MHL94Redesign.jpg|thumb|...''Old Town Hall''.... click to enlarge|left]]


<br style="clear:both;" />
<br style="clear:both;" />


 
<!-- insert signature here, if desired -->


back to [[Main Page|Main Page]]
back to [[Main Page|Main Page]]
[[Category:Andover Answers Index]]
[[Category:Andover Answers Index]]

Revision as of 12:21, 18 November 2019

In 1993, Memorial Hall Library and the Trustees of Memorial Hall Library undertook a front-entrance redesign project to return the building to front landscape and walkway design closer to the original 1920s entrance look and feel. Local landscape arctitect Peter Hornbeck and Andover architect Jane Griswold collaborated on the design which included native plantings, an oval brick patio and granite curbing. Project funding included individual and corporate private donors, Memorial Hall Library Trustee funds and state funds.

The front entrance project was originally part of a major 1987 renovation and addition project. Due to a state-funding budget shortfall, the front-entrance redesign project was not underway until the summer of 1994.

File:MHL94Redesign.jpg
...Old Town Hall.... click to enlarge



back to Main Page