Memorial Hall Library - Landscaping and Memorial Hall Library Entrance Construction Project 1994: Difference between pages

From Andover Answers
(Difference between pages)
Jump to navigation Jump to search
mNo edit summary
 
No edit summary
 
Line 1: Line 1:
See
* Andover File - MHL - Landscaping
<gallery caption="Memorial Hall Library Landscaping Plan prior to October 2011" widths="240px" heights="280px" perrow="3">
Image:Phyllis_Bingham_Garden_side_entrance.jpg|
Image:Image:Phyllis Bingham Garden daylilies.jpg|
Image:Plantings front of library.jpg|
</gallery>


In 1993, Memorial Hall Library and the Trustees of Memorial Hall Library undertook a front-entrance redesign project to return the building to front landscape and walkway design closer to the original  1920s entrance look and feel.  Local landscape arctitect Peter Hornbeck and Andover architect Jane Griswold collaborated on the design which included native plantings, an oval brick patio and granite curbing. Project funding included individual and corporate private donors, Memorial Hall Library Trustee funds and state funds.


The front entrance project was originally part of a major 1987 renovation and addition project. Due to a state-funding budget shortfall, the front-entrance redesign project was not underway until  the summer of 1994.
[[Image:MHL94Redesign.jpg|thumb|...''Old Town Hall''.... click to enlarge|left]]


[[Image:Plantings front of library.jpg|thumb||left| Plantings Front of the Library Note: The Yellowwood Tree that is designated on this diagram (to the right side of the front door) was cut down in November 2001.]]
<br>
[[Image:Phyllis Bingham Garden side entrance.jpg|thumb||left| Phyllis Bingham Garden Diagram]]
[[Image:Phyllis Bingham Garden daylilies.jpg|thumb||left| Phyllis Bingham Garden Diagram of Daylilies]]
<br style="clear:both;" />
<br style="clear:both;" />
The Main Street entrance to the building was re-landscaped in October 2011.
[[Image:landscape.jpg|thumb||left| Plantings Front of the Library October 2011]]
<gallery caption="Memorial Hall Library Landscaping Plan March 2011" widths="240px" heights="280px" perrow="3">
Image:Pg1.jpg|page 1
Image:Pg2.jpg|page 2
Image:PG3.jpg|page 3
</gallery>


<br style="clear:both;" />
<!-- insert signature here, if desired -->


--[[User:Eleanor|Eleanor]] 15:57, January 11, 2008 (EST)
back to [[Main Page|Main Page]]
back to [[Main Page|Main Page]]
[[Category:Andover Answers Index]]
[[Category:Andover Answers Index]]

Revision as of 12:21, 18 November 2019

In 1993, Memorial Hall Library and the Trustees of Memorial Hall Library undertook a front-entrance redesign project to return the building to front landscape and walkway design closer to the original 1920s entrance look and feel. Local landscape arctitect Peter Hornbeck and Andover architect Jane Griswold collaborated on the design which included native plantings, an oval brick patio and granite curbing. Project funding included individual and corporate private donors, Memorial Hall Library Trustee funds and state funds.

The front entrance project was originally part of a major 1987 renovation and addition project. Due to a state-funding budget shortfall, the front-entrance redesign project was not underway until the summer of 1994.

File:MHL94Redesign.jpg
...Old Town Hall.... click to enlarge



back to Main Page