Ristuccia, Michael and Memorial Hall Library Entrance Construction Project 1994: Difference between pages
(New page: Andover resident and builder Mike Ristuccia has moved and renovated many historic houses in town. His work includes the 2002 move of the Captain Stephen Abbott House from 45 Ballardvale R...) |
No edit summary |
||
Line 1: | Line 1: | ||
In 1993, Memorial Hall Library and the Trustees of Memorial Hall Library undertook a front-entrance redesign project to return the building to front landscape and walkway design closer to the original 1920s entrance look and feel. Local landscape arctitect Peter Hornbeck and Andover architect Jane Griswold collaborated on the design which included native plantings, an oval brick patio and granite curbing. Project funding included individual and corporate private donors, Memorial Hall Library Trustee funds and state funds. | |||
The front entrance project was originally part of a major 1987 renovation and addition project. Due to a state-funding budget shortfall, the front-entrance redesign project was not underway until the summer of 1994. | |||
[[Image:MHL94Redesign.jpg|thumb|...''Old Town Hall''.... click to enlarge|left]] | |||
<br style="clear:both;" /> | <br style="clear:both;" /> | ||
-- | <!-- insert signature here, if desired --> | ||
back to [[Main Page|Main Page]] | back to [[Main Page|Main Page]] | ||
[[Category:Andover Answers Index]] | [[Category:Andover Answers Index]] |
Revision as of 12:21, 18 November 2019
In 1993, Memorial Hall Library and the Trustees of Memorial Hall Library undertook a front-entrance redesign project to return the building to front landscape and walkway design closer to the original 1920s entrance look and feel. Local landscape arctitect Peter Hornbeck and Andover architect Jane Griswold collaborated on the design which included native plantings, an oval brick patio and granite curbing. Project funding included individual and corporate private donors, Memorial Hall Library Trustee funds and state funds.
The front entrance project was originally part of a major 1987 renovation and addition project. Due to a state-funding budget shortfall, the front-entrance redesign project was not underway until the summer of 1994.
back to Main Page