|
|
Line 1: |
Line 1: |
| Elm Square was named after the Centennial Elm in it's center. There are seven approaches to the intersection and until 1934 a trolley ran through the intersection. The tree was removed in 1919 because it was determined to be a traffic hazard.
| |
|
| |
|
| See
| | In 1993, Memorial Hall Library and the Trustees of Memorial Hall Library undertook a front-entrance redesign project to return the building to front landscape and walkway design closer to the original 1920s entrance look and feel. Local landscape arctitect Peter Hornbeck and Andover architect Jane Griswold collaborated on the design which included native plantings, an oval brick patio and granite curbing. Project funding included individual and corporate private donors, Memorial Hall Library Trustee funds and state funds. |
| *[http://andover.mvlc.org/opac/en-US/skin/default/xml/rresult.xml?rt=title&tp=title&t=Andover%20a%20Century%20of%20Change&ft=&l=1&d=0&f=&av= ''Andover a Century of Change:1896 - 1996''] by Eleanor Motley Richardson, pages 10 and 134 (974.45 Ric).
| |
| * "The Elm House" in [http://andover.mvlc.org/opac/en-US/skin/default/xml/rresult.xml?rt=title&tp=title&t=andover%20what%20it%20was&ft=&l=1&d=0&f=&av= Andover, What It Was, What It Is. : 300th Anniversary, May 30 - June 2, 1946], (974.45 And).
| |
| *[http://andover.mvlc.org/opac/en-US/skin/default/xml/rresult.xml?rt=title&tp=title&t=elm%20square&ft=&l=1&d=0&f=&av= ''Elm Square: the photographs of Richard Graber, 1962-1969/with an introduction by Howard Yezerski, text by Richard Graber, and recollections of the people of the Town of Andover''] by Richard Graber (Andover Room R 974.45 Gra).
| |
|
| |
|
| *Attached article, "Elm Square Part of the Problem," ''Andover Townsman'', November 2, 2000.
| | The front entrance project was originally part of a major 1987 renovation and addition project. Due to a state-funding budget shortfall, the front-entrance redesign project was not underway until the summer of 1994. |
| [[Image:Elmsquare.jpg|thumb||left| “Elm Square Part of the Problem"
| |
| ''Andover Townsman'', November 2, 2000.....click to enlarge ]]
| |
| <br style="clear:both;" />
| |
| *Attached article, "Centennial Elm Removed," by Charlotte Abbott ''Andover, Townsman'' December 5, 1919. [[Image:elmpage1.jpg|thumb||left| “Centenennial Elm Removed,''
| |
| ''Andover Townsman'', December 5, 1919, page 1.....click to enlarge ]]
| |
| [[Image:elmpage5.jpg|thumb||left| “Centennial Elm Removed,''
| |
| ''Andover Townsman'', December 5, 1919, page 5.....click to enlarge ]]
| |
| [[Image:elmpage7.jpg|thumb||left| “Centennial Elm Removed,''
| |
| ''Andover Townsman'', December 5, 1919, page 7.....click to enlarge ]]
| |
|
| |
|
| | [[Image:MHL94Redesign.jpg|thumb|...''Old Town Hall''.... click to enlarge|left]] |
|
| |
|
| | <br style="clear:both;" /> |
|
| |
|
| [[Image:elm3.jpg|thumb|...Elm Square before the tree before it was removed.... click to enlarge|left]]
| | <!-- insert signature here, if desired --> |
| | |
| [[File:elmsquare1.jpg|200px|thumb|left|Elm Square before 1919]] <br style="clear:both;" />
| |
| | |
| [[Image:Musgrove_Building,_1894.jpg|thumb|...''The Musgrove Building, Elm Square, circa 1894''.... click to enlarge|left]]
| |
| | |
| --[[User:Kim|Kim]] 16:43, December 15, 2009 back to [[Main Page|Main Page]] | |
|
| |
|
| | back to [[Main Page|Main Page]] |
| [[Category:Andover Answers Index]] | | [[Category:Andover Answers Index]] |
In 1993, Memorial Hall Library and the Trustees of Memorial Hall Library undertook a front-entrance redesign project to return the building to front landscape and walkway design closer to the original 1920s entrance look and feel. Local landscape arctitect Peter Hornbeck and Andover architect Jane Griswold collaborated on the design which included native plantings, an oval brick patio and granite curbing. Project funding included individual and corporate private donors, Memorial Hall Library Trustee funds and state funds.
The front entrance project was originally part of a major 1987 renovation and addition project. Due to a state-funding budget shortfall, the front-entrance redesign project was not underway until the summer of 1994.
back to Main Page