Telephone and Memorial Hall Library Entrance Construction Project 1994: Difference between pages

From Andover Answers
(Difference between pages)
Jump to navigation Jump to search
No edit summary
 
No edit summary
 
Line 1: Line 1:
In the late 1880's Moses Stevens connected the Marland Mills - one in Andover, one in Haverhill, and one in North Andover - by telephone.  This was the first telephone in Andover. Moses Stevens had bought Marland Mills from Abraham Marland in 1879.


In the 1958 dial telephones came to Andover. The first exchange was Greenleaf (475).  Andover originally had a 617 area code. It was first changed to 508 and finally to 978 in 1977.
In 1993, Memorial Hall Library and the Trustees of Memorial Hall Library undertook a front-entrance redesign project to return the building to front landscape and walkway design closer to the original 1920s entrance look and feelLocal landscape arctitect Peter Hornbeck and Andover architect Jane Griswold collaborated on the design which included native plantings, an oval brick patio and granite curbing. Project funding included individual and corporate private donors, Memorial Hall Library Trustee funds and state funds.  


The front entrance project was originally part of a major 1987 renovation and addition project. Due to a state-funding budget shortfall, the front-entrance redesign project was not underway until  the summer of 1994.
[[Image:MHL94Redesign.jpg|thumb|...''Old Town Hall''.... click to enlarge|left]]


See
* [http://andover.mvlc.org/opac/en-US/skin/default/xml/rdetail.xml?r=103693&t=historical%20sketches%20of%20andover&tp=title&d=0&hc=7&rt=title ''Historical Sketches of Andover''] by Sarah Loring Bailey, (974.45 Bai), p.590
* [http://andover.mvlc.org/opac/en-US/skin/default/xml/rdetail.xml?r=487303&t=andover%20a%20century%20of%20change&tp=keyword&d=0&hc=2&rt=keyword''Andover a Century of Change:1896 - 1996''] by Eleanor Motley Richardson, (974.45 Ric), pages 84 and 147.
* "Area Code Changing Again", ''The Townsman'', July 24, 1997.
<br style="clear:both;" />
<br style="clear:both;" />


<!-- insert signature here, if desired -->


--[[User:Eleanor|Eleanor]] 16:27, November 17, 2009 (EST)\
--[[User:Eleanor|Eleanor]] ([[User talk:Eleanor|talk]]) 13:41, 22 October 2015 (EDT)
back to [[Main Page|Main Page]]
back to [[Main Page|Main Page]]
[[Category:Andover Answers Index]]
[[Category:Andover Answers Index]]

Revision as of 12:21, 18 November 2019

In 1993, Memorial Hall Library and the Trustees of Memorial Hall Library undertook a front-entrance redesign project to return the building to front landscape and walkway design closer to the original 1920s entrance look and feel. Local landscape arctitect Peter Hornbeck and Andover architect Jane Griswold collaborated on the design which included native plantings, an oval brick patio and granite curbing. Project funding included individual and corporate private donors, Memorial Hall Library Trustee funds and state funds.

The front entrance project was originally part of a major 1987 renovation and addition project. Due to a state-funding budget shortfall, the front-entrance redesign project was not underway until the summer of 1994.

File:MHL94Redesign.jpg
...Old Town Hall.... click to enlarge



back to Main Page