Memorial Hall Library Entrance Construction Project 1994: Difference between revisions

From Andover Answers
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:


In 1993, Memorial Hall Library and the Trustees of Memorial Hall Library undertook a front-entrance redesign project to return the building to front landscape and walkway design closer to the original  1920s entrance look and feel.  Local landscape architect Peter Hornbeck  
In 1993, Memorial Hall Library undertook a front-entrance redesign project to return the building to front landscape and walkway design closer to the original  1920s entrance look and feel.  Local landscape architect Peter Hornbeck  
( [[Hornbeck, Peter]]) and Andover architect Jane Griswold collaborated on the design which included native plantings, an oval brick patio and granite curbing. Project funding included individual and corporate private donors, Memorial Hall Library Trustee funds and state funds.  
( [[Hornbeck, Peter]]) and Andover architect Jane Griswold collaborated on the design which included native plantings, an oval brick patio and granite curbing. Project funding included individual and corporate private donors, Memorial Hall Library Trustee funds and state funds.  



Revision as of 14:06, 18 November 2019

In 1993, Memorial Hall Library undertook a front-entrance redesign project to return the building to front landscape and walkway design closer to the original 1920s entrance look and feel. Local landscape architect Peter Hornbeck ( Hornbeck, Peter) and Andover architect Jane Griswold collaborated on the design which included native plantings, an oval brick patio and granite curbing. Project funding included individual and corporate private donors, Memorial Hall Library Trustee funds and state funds.

The front entrance project was originally part of a major 1987 renovation and addition project. Due to a state-funding budget shortfall, the front-entrance redesign project was not underway until the summer of 1994. The Andover Historic Footprints Committee, led by Norma Gammon and Larry LaMagna raised more than $60,000 from private donations to ensure the completion of the work.

A small delay in the completion of the project was reported on in the September 1, 1994 edition of the Lawrence Eagle Tribune. The delay was due to the fact that the granite curbing company delivered pieces that did not fit as they were supposed to. The final dedication for the new park landscaping and stonework as well as a newly renovated foyer was held on January 8, 1995.


...Front Entrance Redesign Articles.... click to enlarge


...MHL Front Entrance.... click to enlarge
...Brick Fundraiser Flier.... click to enlarge






back to Main Page